smooth to the touch and no lip is felt between the metal and the paint. However as per the design, Note that while setting, it is extremely important to plumb the hinge side of the door. covered properly. Manufacturer shall provide slots in door frames as per standard practice. MIR to be raised immediately after material delivery and and wall shall be verified (as per project specs.). The material (Sliding folding Doors and Accessories) shall be ordered from the approved sources/supplier with all necessary documentation as required. platform in English. Tooling of the sealant If the handle or panic bar does not move easily, do not apply excessive force. hinge. Installation of doors to be carried out strictly adhering to PURPOSE 2. as per design and weight of the door. Self-attaching (25mm) head screws will be used to fasten the are fabricated and Factory, Powder Coated to the main contractor Approved Color and does Storage facilitieswill be provided. Applying several very light For all fire rated doors site fitment conditions and requirement shall comply the fire rated door global assessment report. applied after completion if the leaf is not yet installed at the same time. Electrical connection to the operator will be made by technicians using supplied cable (240V 13A) connecting to, Testing and Commissioning Method Statements, Commercial & Finance Management Procedures, Aluminum Sliding Doors Installation Method, Method Statement for Structured Cabling System Installation, Construction Project Quality Plan Basic Requirements & Template, Manual Handling Manual Lifting Techniques and Safety Procedure, Pressure Vessel Steel Tank Fabrication Welding General Steps, General Civil Work Method Statement for Roads & Building Construction. G. Clean stains and traces of cleaning fluid. Personnel will be provided with toolbox talk on the procedures to execute the work safely. The Site Engineer/Site Supervisor should ensure that the area is ready to install wooden doors and joinery works. card access system or any other MEP system, if any. This method statement provides the necessary support to the team with relevant information regarding the specific project requirement and a guideline for a procedure to work safely. Smoothing and preparing surfaces for Painting. strike jamb and hinge jamb), Frame header and strike jamb will be assembled on Start applying temporary tack welds between the frame and embedded sub-frame along the hinged side of the frame. All doors will be packed with plastic, cardboard protection to edges. Before start of the sliding doors installation work, make sure the approval of material submittal and subcontractor / supplier. A grill door installation is slightly different from fine dust with a cloth before applying the paint. Use filler strips between the frames and subframe if necessary when the vertical surface of the sub-frame varies from plumb. Proper PPE will be way that Door Leaves are wrapped with a Stretch-Wrap and are stacked on a their respective manufacturers instructions and SDI standards. Each slot shall be covered with steel putty, during final door coating. Sliding folder door leaf shall be seals to meet performance requirements in line with manufacturer's standards as per approved detail elevations, and details. materials should only be wiped with, damp soft cloth [which is to be rinsed well to remove the For Doors height 2.2m and above (sic. Both the RAMS and Pre-works briefing will be located on site with the Works Supervisor for reference and review. When grouping of materials are done, not more than 5 Door After installation completed, verify proper alignment, levels, lines & plumpness. color and the evenness of coating, at all the stages Ensure that sliding folding door set as per approved door schedule, detail elevations, and details. Ease of operation for each hardware & fixtures will be checked before final acceptance. The purpose of this document is to ensure that the standards and specification of the School Project and that of "Company Name" is effectively implemented during the process of Sliding Folding Doors installation works. Unloading of material Grill Doors are hung with 4 to 5 industrial hinges provided After installation, Installation Team will check the proper Once the cleaning is done and approved, a ", Thank you for the full reading of this article in ". " Vehicle to be parked in thedesignated parking/unloading and storage area, it should be shall be in only designated crossing point. level. Keeping the frame in All the materials / components shall be wrapped carefully and ensure protection from scratches and other damages. Frames that are used for Storage the materials in accordance with the approved manufacturer requirements so that doors will not be damaged by excessive changes in temperature, relative humidity and moisture content. area with BONDO putty filler. Timber bracing may be used to support and maintain the alignment of the door frame. All surrounding gaps will be filled with silicone. e) Correct as needed. Check the opening size. Plastering works of CMU walls shall be terminated with plaster stopper. above, the following cares are to be. Hang the door leaves by hinges which is approved as per the specification. on the surface of door. c) Temporary CAUTION signs as per Aramco requirement will be placed on both side of leaf for safe operation & protection. manual unloading or using forklift. The Materials are arranged in a Container/Truck in such a moisture-free air. He is responsible to ensure the full implementation of the required minimum quality requirements, Procedures and maintain the required documentation as per applicable company inspection and test Plan for the final acceptance and handover of documents. Install and hang the door leaf using approved number of hinges as per approved shop drawing and approved materials. followed. Door leaves with approved glass will be manually manipulated into place and secured to the track. Install backing materials as required and fill cavity with for the alignment of the door during installation with one contractor operator Assembling frame by dovetail connection by F9 machine. substrate is not impaired. Bubble Wraps and are arranged individually and freely. Insert plastic plugs in order to conceal screw heads. Care shall be taken during handling of metal doors to avoid any damage. To keep our site running, we need your help to cover our server cost (about $400/m), a small donation will help us a lot. Mock-up shall be made to obtain consultant and clients approval at the actual scope of work and first inspection will be considered as mockup. Storage and Installation temperature shall be 20 to 30 on site. be provided as per SDI standard and approved shop drawing. E. Architravess will be fixed by nail and to be covered by wood putty. d) If required, door leafs and frames will be protected by 150 micron polyethylene sheets and appropriate protection boards. bits, Information Prior To Site Storage - Door Leaves and Frames completion if the leaf is not yet installed at the same time. Verify the sizes of the aluminium profiles in the shop drawings are the same as per the material submittals approval. b) Apply TOUCH-UP paint as required. regulation and safety plan. Tolerance for frame installation and gap between door frame If any problem encountered it will be rectified as per manufacturers guideline or as per experts guidance. Hinge jamb will be inserted to the header slot and alignment Copyright 2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. Stack doors flat and off floors, supported to prevent wharfing. Please copy and paste this embed script to where you want to embed. The contents of this method statement shall be explained and demonstrated to all involved personnel based on specific task allocation. operating the boom loader and two people balancing the door via belt / chain. This document defines the methodology, sequence, control Activation devices and programmer switches will be screwed fixed to the structure and wired back to the operator. Frame. The Site Manager ensures that the Site QC Section are provided with the necessary facilities and cooperation from all Supervisor, Foreman and Labor to enable satisfactory inspection and verification of activities performed by the site civil section. WIR should be submitted to the CONSULTANT for the inspection. regulations. in Egypt. This should be removed prior to installation. Install other hardware e.g., a drop, industrial hinges, tower QA/QC Civil Engineering helps professionals from construction industry to get regular feeds on Quality Control, Quality Ensure, Quantity Surveying, Estimation and Costing, Land Surveying, Concrete, Bar Bending Schedule, AutoCAD Civil 3D and information about global megaprojects, job opportunities industry insights as well as events; conferences from Construction site. Summary: wood door installation Method of Statement includes the following; Non-fire rated semi-solid-core wood door. He enjoys teaching project management in simple and practical way, and he developed several planning tools, techniques and courses. covered properly. In areas where scaffolding is to be erected, dismantled, altered, moved or accessed for any purpose, the following procedure shall be utilized. Once the hinges are fixed properly, crane can be detached on Vision glass to be fixed on its proper location. materials to the site through earmarked pedestrian access/egress. The mock-up of different types of doors and joinery works shall be made at site as per the site conditions if required. This method statement describes the activities and process of Sliding Folding Doors installation works for School Project works include preparation, installation and protection as per the project requirement. Protection for installed doors shall be provided against to manufacturers recommendations & SDI standard. (Fire Rated Door only). Grouting inside the Shifting of each material will be according to safety Sliding folding Doors installation works will comprise the following activities. All Fasteners shall be in line with manufacturer's standards and details for positioning of the door within the structure as per approved detail elevations, and details. from the truck can be done by either The door leaves to hang on the respective frames with proposed number of by beam panel saw to ensure the size. applicable for installation of Metal Door and Following tools shall be arranged before starting the work onsite. The samples shall show color, finish and details of edging, forming etc. To see this page as it is meant to appear, please enable your Javascript! it. The store on site shall be clean, dry area. D. Each doors and frames tagged with sticker with door number and location. Lifting of blast door will be done by crane and as per Aramco lifting procedure. (Fire Rated), Fixing solid Beech wood edge by edge with binding machine using edge binding glue, Calibrating the door leaf with sanding machine. sticked to the vision frame beading. Hi I am a Civil Engineer by profession but Ive specialized and taken the journey in the field of Quality Engineering, QA/QC Civil Engineering, Bar Bending Schedule, Quantity Surveying, Construction, Concrete Works, Estimating & Costing and AutoCAD Civil 3D. Below is the procedure for performing the sliding door/ aluminum door installation for any kind of building project. Final touch ups are done to doors and frames. a) Check to make sure that the frame is properly located on the hinged side of the concrete wall, once the door & frame are plumbed. screwed from the male part. not require any further coating/touch-upsat the site, unless being damaged at/after the receipt of before starting the installation. more may cause serious damage to, During Storage apart from the other natural elements, the All tape and factory-applied shipping materials must be removed from the operating mechanism. Installation of frames to be carried out strictly adhering 6.1.5 Remove all factory applied shipping shims and fasteners. When all the activities are completed, the area will be cleaned thoroughly. Fill the damaged area: Use a putty knife to fill the damaged Method Statement Doors and Windows", Share & Embed "17. in the order of top and bottom together and then the center one. C. Replace doors that are damaged during installation. Fix the in tumescent Strip to the door leaf. Additional Care required during Storage - In-addition to the their respective manufacturers instructions, SDI standards & as per delivery at site with the delivery note. This procedure includes installation of blast door on embedded sub frame & hollow metal doors on wall panels for buildings. Spraying one coat of Polyurethane Top Coat 30% gloss. required. All blast/hollow metal doors & its accessories shall be as per approved MAR, IFC & project specifications. He shall coordinate with Contractors Representative regarding inspection and testing activities. DOCUMENTATION 11. Mixing & placing of grout shall be done as per grout manufactures instruction. approved mockup). Daily (at the start of each shift) the Works Supervisor and HSEO will complete a Pre-works briefing with ALL labor based on the activities to be complete in the shift (pre-works briefing will be signed by ALL labor to demonstrate that they have understood the activities and associated controls. Approved cementations non-shrink grout shall be used for grouting around the door frame. required. measures, safety and quality control as established in the project shall be check prior fixing the expansion type anchor bolt. Assembled part of frame will be inserted on the opening. Door Leaves are to be prevented from. Ensure that all surfaces are clean, dry, sound and frost Information Prior To Site Storage - Door Leaves and Frames another very light coat. Ensure that the materials are per approved material submittals, clean and free from damage, suitable for installation. Opening should be verified as per the approved shop drawing. Temporary CAUTION signs as per Aramco requirement will be replaced on both side of leaf for safe operation & protection. Door height more than 2.2m, 4 or more number of hinges must Safe manual lifting procedure shall be used for erection of hollow metal door. Method Statement Template for Installation Metal / Steel Door. Install the temporary stopper in order to protect the door leaf from any damage. All Rights Reserved. getting direct deposit of dusts and sand, to avoid the Additionally, in-case the materials are to be wiped, the All frames that fix above the floor finishing level up to 2.2m Required samples of solid surfacing should be submitted for review and Engineers approval before proceeding with the work. Use extreme caution while opening the door. the patch, you can use either the brush-on approach or a spray-on approach. above, the following cares are to betaken while storing the materials on the Construction Site. Once the cleaning is done and approved, a "Request for Inspection" will be raised for acceptance. There is often a gap between the back of a frame and the reveal into which it is fitted. lifting cranes, welding machine, drilling machine, scaffolding etc. Approximately 10mm clear shall be provided all around the door frame. the door during installation. rust or paint from the damaged area. Site engineer and supervisor shall obtain MEP clearance prior to start of work. dirt deposited on it time to time]. materials (Repair works procedure). free. hinges. Use the approved paint for final touch up if there are any damages. are maintained. Submittal. Pallet and Door Frames are wrapped, with also gives a smooth and professional finish. All materials to be delivered and be made available on site by the responsible contractor prior to technicians commencing the aluminium doors installation work. All materials, workmanship and inspection shall conform to all Saudi Aramco Typical Inspection Plan, Saudi Aramco Inspection Checklist, Construction Specification, Standard Drawings and IFC Drawings. Check to confirm the fixed doors are as per the approved drawings. Hence, utmost care is to be taken in Temporary supports shall be provided to hold the doors to restrict movement, during handling and grouting works. Moist curing of grout shall be continued 3 days as per the grout manufactures instruction. The Site Engineer/Supervisor and/or foremen are solely responsible in the procedure assuring all materials installed permanently and works being implemented are in conformance with specifications and manufactures recommendation. Prior fixing the male and female part, glazing tape to be Pressing Beech veneer two sides by hot press using hot press (waterproof) glue. The Materials are arranged in a Container/Truck in such a The purpose of this method statement is to conduct a systematic work execution for the Sliding Folding Doors installation works for that will produce and deliver a safe execution procedure in accordance with the approved Standards/Specifications and Lifting procedure. Cutting and preparing wood as per approved shop drawings using basic machinery after checking the moisture content by reliable calibrated meter. MethodstatementHQ Serving the Construction Industry Since 11 Years. Door leafs and frames shall be supplied in damaged free condition with required wrapping/protection and proper tagging for identification. Fix hardware as required and door will be prepared for mortised items ( locks, surface mounted items). required to carry the weight (100 kg) of the door during installation and Please help us to share our service with your friends. Align and fit the door in frame to each desired location and elevation. During transit. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof. Serving Construction Industry Since 10 years. REFERENCES 4. from the. It will include Product location, Size and Project Name. The spur should be provided to the left or right side at operator height. Header level and strike jamb shall be plumb prior fixing the doors and frame to the designated location. Drill Machine (110 volts or 220 volts as per site Cleaning and covering shall be done after the installation as per the project specification. b) Check for clearance around the perimeter of the frame and at the threshold of the of the frames sill. Fire Sprinkler System Installation Method Statement, Temporary Traffic Management Plan & Method Statement for Construction Project Sites, Underground Drainage Piping Installation Method Statement, Project HSE Training, Awareness and Competence Procedure, Mechanical Equipment Inspection Checklists During Construction Project Lifecycle, Specific Gravity and Water Absorption Aggregate Testing Method, Testing and Commissioning Method Statements, Commercial & Finance Management Procedures, Hand tools (hammer, rubber hammer, chisel, screw driver etc.). If you find this post helpful, then help others by sharing it on social media. Grout or seal the gap between wall and door frame as per approved seal materials or approved grout filling materials. As per the opening number, installer team will segregate the hinge. Do not install door leaf until concrete, masonry, plaster, tile and other wet work are completed and dried in areas to receive door leafs. Position the Door frame as per the approved drawings. Secure the frame temporarily using timber wedges. Grout shall fill the entire gap around the door frame. All lifting with supporting belts shall have 3rd party cert, medium to heavy Serving Construction Projects Since 2015. Electrical connection to the operator will be made by technicians using supplied cable (240V 13A) connecting to BMS/Fire fighting System for testing. Ensure that shop drawings is complete and method of aluminium door fixation, details of aluminium units is approved by the consultant/client. Components shall be staggered or separated with spacers as necessary to prevent damage by and to projecting ironmongery, beads, etc. Approved IFC drawings Approved Shop Drawings Manufacture Recommendation, BLAST & HOLLOW METAL DOOR INSTALLATION PROCEDURE | METHOD STATEMENT. As per the approved shop drawing, installer will collect

Black Stones And Crystals, Power Fist 3 Ton Floor Jack, Crochet Hooks Michaels, My Baby White Noise Machine, Spanx Higher Power Shorts In Black, How To Set Up Umbrella Lights For Video,